(Cite as: 24 App. V.S.A. ch. 235, § 97)
  • § 97. Meters

    A person supplied with electric light or power may, by a notice in writing, delivered to one of said Board, request the testing of the meter used to measure the electric power used by him or her or another. Said Board, upon receipt of such request, shall cause the meter complained of to be tested and, if found defective or incorrect, shall cause the same to be corrected or a correct meter to be installed. After such complaint is received by said Board, and until an incorrect or imperfectly recording meter is corrected, or a new or correct meter is installed by said Board, the Village shall not collect more than the minimum charge per month.